EU Battery Passport 2027: 12.8V 150Ah and 156Ah LiFePO4 Importer Guide

Share This Article

From 18 February 2027, Regulation (EU) 2023/1542 Article 77(1) requires an electronic record — the battery passport — for each light means of transport (LMT) battery, each industrial battery with a capacity greater than 2 kWh, and each electric-vehicle battery placed on the market or put into service in the EU. Article 13(6) requires a QR code on all batteries from the same date. For passport batteries, that QR code is the way into the passport.

This page is a working brief for EU importers, distributors and private-label brand owners who buy 12.8V 150Ah and 12.8V 156Ah LiFePO4 packs — the 12V-class sizes that sit closest to the 2 kWh figure in Article 77, and that buyers will search for once the rule starts to bite. It sets out what the Regulation asks, what data to collect from the pack supplier (including the cell maker and datasheet), and a checklist you can send with an RFQ. Broader dates and recycled-content rules are in our EU Battery Regulation 2023/1542 buyer briefing.

Whether a given SKU needs a passport is judged from the rated energy declared by the manufacturer and the battery category under Article 3. Confirm that per project. LJY Energy is a Shenzhen LiFePO4 trader and OEM/ODM coordinator, not a factory, and does not issue battery passports. This page is informational, not legal advice.

Send your 12.8V 150Ah or 156Ah SKU list for a project-specific data check · WhatsApp +86 159 8945 0735

What the rule asks

  • Who must have a passport, and from when. Article 77(1): from 18 February 2027, each LMT battery, each industrial battery with a capacity greater than 2 kWh, and each electric-vehicle battery placed on the market or put into service. The 2 kWh figure is attached to industrial batteries in that sentence; LMT and EV batteries are named without that capacity floor. The Commission’s August 2026 passport guidance repeats the same wording.
  • Category comes first. Article 3 defines portable batteries (sealed, 5 kg or less, and not industrial, EV, LMT or SLI), LMT batteries, SLI batteries, electric-vehicle batteries, and industrial batteries. An industrial battery includes a battery specifically designed for industrial uses, or any other battery that weighs more than 5 kg and is not an EV, LMT or SLI battery (Article 3(1)(13)). Recital 15 states that batteries used for energy storage in private or domestic environments should be considered industrial batteries for the purposes of the Regulation. A 12.8V leisure, RV, marine or solar house battery is therefore classified under those definitions, not by the sales name on the carton. Confirm the category per project.
  • QR code and data carrier. From 18 February 2027 every battery must carry a QR code (Article 13(6)). For LMT batteries, industrial batteries with a capacity greater than 2 kWh, and EV batteries, the code opens the passport (Articles 13(6)(a) and 77(3)). For other batteries it opens the applicable label information, the EU declaration of conformity and the waste information (Article 13(6)(b)). The QR code and the unique identifier must comply with the ISO/IEC 15459 series or equivalent (Article 77(3)). Labels and the QR code are printed or engraved on the battery, or, where that is not possible, on the packaging and accompanying documents (Article 13(7)).
  • Who is responsible. The economic operator placing the battery on the market must keep the passport accurate, complete and up to date, and may give written authorisation to another operator to act on its behalf (Article 77(4)). For a finished pack shipped from China, that operator is normally the EU importer. If the battery carries your brand, Article 44 treats you as the manufacturer as well. The passport contains model-level and unit-level information as set out in Annex XIII, “to the extent applicable” to the category concerned (Article 77(2)).
  • Related timelines, not all due on the same day. Carbon-footprint declaration dates in Article 7 are staggered by category and run from the later of a stated calendar date or a set period after the Commission’s methodology and format acts enter into force. Battery due-diligence policies in Chapter VII apply from 18 August 2027, deferred by Regulation (EU) 2025/1561; Article 47 sets a net-turnover threshold of EUR 40 million. Ask the supplier what can be provided now and what follows later, rather than assuming every Annex XIII field is already complete.

12.8V 150Ah and 12.8V 156Ah packs

Buyers often calculate a reference energy as nominal voltage × rated capacity. For the two packs this page is written around, and two neighbouring 12V sizes for context, that arithmetic is:

Pack (nominal)Reference energy (nominal voltage × rated capacity)
12.8V 100Ah12.8 V × 100 Ah = 1.28 kWh
12.8V 150Ah12.8 V × 150 Ah = 1.92 kWh
12.8V 156Ah12.8 V × 156 Ah = 1,996.8 Wh = 1.997 kWh
12.8V 200Ah12.8 V × 200 Ah = 2.56 kWh

Treat those figures as a reference only. Article 77(1) uses the battery’s capacity in kWh, and Annex VI / Annex XIII fields include the values declared by the manufacturer. A label, a datasheet or a test report may use a rated energy that is not identical to nominal voltage × rated ampere-hours. The decision for any SKU is made from the declared rated energy and the battery category. Confirm per project.

150Ah-class cells inside a 12.8V 150Ah pack

A 12.8V 150Ah LiFePO4 pack is commonly built as four 3.2V-class 150Ah prismatic cells in series (4S). That cell identity — maker, model, current datasheet, and the QR or laser mark used for cell traceability — is data an importer should request from the pack supplier. It supports the composition, origin and identification fields that Annex XIII expects you to be able to fill. The models below are examples of 150Ah-class prismatic LFP cells used in this format. This is not a stock list, and it is not a statement that any two cells can be substituted for each other.

  • EVE LF150. EVE Power specification PBRI-LF150-D06-01, Version A (first issue 31 May 2023), states nominal capacity 150.0 Ah, nominal energy 483.0 Wh and nominal voltage 3.22 V (0.5C charge/discharge, 25 ± 2 °C, 2.5–3.65 V, fresh cell). The same 150 Ah / 3.22 V figures appear on EVE Energy North America’s prismatic LFP table. Ask the supplier for the current manufacturer specification that matches the cells actually used in the lot.
  • CATL, model CB260. CATL product specification CTPS-CB260-01 Rev 1.0 (“Product Specification of 150Ah Cell”) describes a 150 Ah lithium iron phosphate cell, model CB260, with standard and minimum capacity 150 Ah at 25 ± 2 °C, 1C, new-battery state, and working voltage 2.5–3.65 V (T > 0 °C). The specification does not list a separate “nominal voltage” line. Request the current manufacturer specification from the supplier for the cells in your pack.
  • REPT CB51-150Ah and Gotion IFP54173145A-150Ah are 150Ah-class prismatic models widely listed in the trade. At the time of writing we did not find a current official product sheet for either model on the makers’ public websites, so distributor figures should be treated as unverified until you hold the manufacturer’s datasheet. Confirm per project.

12.8V 156Ah packs. 156 Ah is less commonly listed as a standard cell size in the current public catalogues of the makers above. A 12.8V 156Ah pack rating may reflect a measured or project-specific pack capacity built from 150Ah-class cells, or a different cell model. Ask for the cell maker and model, the datasheet that belongs to those cells, and the pack’s declared rated capacity and energy. Confirm per project.

What to request from the supplier

The legal duty sits with the operator placing the finished battery on the EU market. The pack builder’s part is to hand you the data, in writing, model by model, in time for the QR code and identifier to be applied on the production line. A practical request list:

  1. The battery category proposed under Article 3, and the intended use (for example RV house bank, marine, solar storage).
  2. The rated energy (kWh) and rated capacity (Ah) as they will appear on the label and in the technical documentation, plus the basis of those values.
  3. The name and address that will appear on the battery as manufacturer, and confirmation of who takes the Article 38 / Article 44 role if you apply your own brand. Our private-label programme page walks through that role for EU brand owners.
  4. The unique-identifier format and the QR / data-carrier artwork (ISO/IEC 15459 or equivalent): who generates the serial range, who prints or engraves the code, and a label sample to approve before mass production.
  5. A passport data package mapped to Annex XIII: public label data (Annex VI Part A), material composition, voltage and capacity, performance and durability values already required for rechargeable industrial batteries above 2 kWh under Article 10, test reports, and dismantling / spare-part information where it applies.
  6. Cell maker, cell model, the current manufacturer datasheet, and cell-level traceability (QR or laser mark) for the cells in the pack.
  7. Carbon-footprint file status and the expected timeline under Article 7 — what can be supplied now, and what waits for the Commission’s methodology and format acts.
  8. Due-diligence information status under Chapter VII, from 18 August 2027, where that Chapter applies to the operator.
  9. The EU declaration of conformity, CE marking plan, separate-collection symbol (required on all batteries since 18 August 2025), and waste-prevention information.
  10. A written arrangement on who keeps the passport accurate after the battery is placed on the market (Article 77(4)).

Importer checklist

  • SKU list with nominal voltage, rated Ah, declared rated energy, weight, and intended EU use.
  • Proposed Article 3 category for each SKU, with the supplier’s written basis.
  • Label draft showing rated energy, rated capacity, manufacturer identity, and QR position and size.
  • Cell maker, model, datasheet and traceability mark for each SKU — including 12.8V 150Ah and 12.8V 156Ah packs listed separately.
  • Annex XIII data pack, or a field-by-field gap list with dates.
  • Carbon-footprint and due-diligence document status, even if those fields are not all required on day one.
  • Who generates the unique identifier, who prints the QR code, and who updates the record after sale.

Send that pack with your RFQ. We will go through it with the pack builder and confirm, per project, what still needs to be collected.

Request a project-specific battery-passport data check · WhatsApp +86 159 8945 0735