LiFePO4 storage for solar irrigation in northern Ghana

In northern Ghana, farms and communities use solar pumping and small mini-grids because the grid is far or unreliable, and the dry season is long. Sites around Tamale and further north are hot by day, dusty, and often hours from a workshop. An EPC specifying LiFePO4 storage for solar irrigation in northern Ghana needs a block that can be repeated and that can be serviced with a short spare-parts list.

LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen, not a factory, and we do not design or build mini-grids. We coordinate 25.6V and 51.2V banks, and rack modules, with BMS protection. The inverter protocol, module count and enclosure for heat and dust are confirmed per project.

Solar irrigation array in northern Ghana, used for dry-season farming
Photo: Ibn Shiraz, Wikimedia Commons, CC BY-SA 4.0 (resized, WebP). Illustration, not an LJY product.

Request a storage proposal for northern Ghana · WhatsApp +86 159 8945 0735

What the EPC defines per site

ItemWhy it mattersConfirmed per project
25.6V or 51.2Vdaily pump or village loadAh and module count
Rack modulesservice and later expansionformat and spares
Inverter protocolCAN or RS485 depending on the unitmodel and checklist
Heat and dustnorthern dry seasonenclosure and ventilation
Documentsimport and site deliveryUN38.3, SDS per model

We do not claim compatibility with a named inverter; the EPC checks the protocol in the manufacturer’s documents and, if needed, with a test.

Data the EPC gathers before a quote

  • Daily energy in kWh and planned autonomy.
  • Inverter model and communication protocol.
  • Pump type, head and hours of operation.
  • Peak temperature, dust and enclosure plan.
  • Access, spare-module plan and number of sites.

A block that can be repeated

EPCs who validate one block at a first irrigation site, with the real dry-season load, avoid rewriting the bill of materials when the programme moves to other districts. Prices and lead times only in a quotation.

Irrigation site at Gbulahagu in the Northern Region of Ghana
Photo: Knowledge and philosophy, Wikimedia Commons, CC BY-SA 4.0 (resized, WebP). Illustration, not an LJY product.

How we proceed

Load and site data → storage proposal → first block → repeat at other sites. Prices, quantities and lead times only in the formal quote.

Send the load and inverter data and request a proposal

LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.