Catfish and tilapia ponds around Ilorin, Ibadan and in the Niger Delta need moving, aerated water through the night. When the grid drops, as it often does, a paddle-wheel or blower that stops for a few hours can kill a pond. Farmers who have relied on diesel to keep the aerators turning now ask for a battery. Anyone searching for a solar aerator battery for a Nigerian catfish or tilapia farm has to turn the aerator’s input power into kilowatt-hours, not just copy the motor’s kW nameplate.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen, not a factory, and we do not install or run farms. We coordinate 12.8V, 25.6V and 51.2V banks. The module count comes from the aerator’s measured or nameplate input power multiplied by the hours of darkness and by the hours of a typical outage, with a margin the farm agrees. The inverter or DC drive, and protection from heat and splash, are confirmed per project.

Request an aerator-bank quote for a Nigerian farm · WhatsApp +86 159 8945 0735
What the farm defines per pond
| Item | Why it matters | Confirmed per project |
|---|---|---|
| 12.8V or 25.6V | smaller blowers and farm workshops | current and enclosure |
| 51.2V wall-mounted or rack | several aerators on one bank | kWh and module count |
| Night and outage hours | oxygen must not drop while the grid is away | logged or estimated hours |
| Inverter or starter | the aerator is a motor load, with a start current | model and surge |
| Heat and splash | open ponds in Nigerian heat | enclosure and placement |
The example arithmetic is only a method: a 1.1 kW aerator running 10 hours needs about 11 kWh plus losses and a reserve. A logged night on the farm is a better number than the nameplate alone.
What the operator sends before a quote
- Aerator type, input power and how many units share a bank.
- Hours the aerators must run at night, and typical outage hours.
- Inverter or starter already chosen, if any.
- Number of ponds in the first installation and later.
- UN38.3 and SDS for the chosen modules come with the quote.
Prove one pond, then repeat the bank
Farms that run one pond through a hot week of real outages, then freeze the module count, repeat the same bank on the next ponds without guessing again. Prices and lead times only in a quotation.

How we proceed
Aerator load and hours → bank proposal → first pond → repeat ponds. Prices, quantities and lead times only in the formal quote.
Send your aerator data and request a proposal
LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.
