Shrimp and prawn ghers around Khulna, Satkhira and Bagerhat are stocked more densely than before, and denser ponds need aerators at night, when oxygen falls. Rural feeders still shed load, and running a diesel set for every gher is expensive. An operator searching for a battery for shrimp gher aerators in Khulna has to turn aerator input power and night hours into kilowatt-hours, instead of copying the motor nameplate.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen, not a factory, and we do not install or run farms. We coordinate 12.8V, 25.6V and 51.2V banks. The module count comes from the aerator’s measured input power multiplied by the night hours and the load-shedding hours, with a margin the operator agrees. The inverter or DC drive, and an enclosure for monsoon humidity and brackish splash, are confirmed per site.

Request an aerator-bank quote for a Khulna gher · WhatsApp +86 159 8945 0735
What the operator defines per gher
| Item | Why it matters | Confirmed per project |
|---|---|---|
| 12.8V or 25.6V | small paddle-wheels and hatchery blowers | current and enclosure |
| 51.2V wall-mounted or rack | several aerators on one bank | kWh and module count |
| Night and load-shedding hours | oxygen falls after dark | logged or estimated hours |
| Inverter or starter | aerators are motor loads with start current | model and surge |
| Humidity and splash | monsoon air and brackish water | enclosure and placement |
The arithmetic is only a method: a 0.75 kW aerator running 9 hours needs about 6.75 kWh plus losses and a reserve. A logged night at the gher is a better number than the nameplate alone.
What the operator sends before a quote
- Aerator type, input power and how many units share a bank.
- Hours of night aeration and typical load-shedding hours.
- Inverter or starter already used, if any.
- Number of ghers in the first installation and later.
- UN38.3 and SDS for the chosen modules come with the quote.
Prove one gher through a hot month
Operators who run one gher through a hot pre-monsoon month with real load-shedding, then freeze the module count, repeat the same bank on neighbouring ghers without guessing. Prices and lead times only in a quotation.

How we proceed
Aerator load and hours → bank proposal → first gher → further ghers. Prices, quantities and lead times only in the formal quote.
Send your aerator data and request a proposal
LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.