Around Apia and on rural Upolu or Savai’i sites, an EPC often has to keep clinic, school or household loads running when the diesel set is not meant to run all night. Island freight and cyclone-season weather also shape how a bank is specified. Anyone searching for LiFePO4 storage for off-grid sites in Samoa needs to turn measured essential watts and planned autonomy hours or days into kWh — not copy the array’s peak watts or a neighbour’s ampere-hour figure. This page is about that bank. It is not a photovoltaic design guide and it is not a diesel-savings claim.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen; we are not a factory, we do not install in Samoa and we do not supply arrays, inverters, diesel sets or civil works. We coordinate 25.6V and 51.2V banks. An existing diesel set, if the site already has one, stays for long bad-weather spells; starter or genset batteries stay separate. We do not publish guaranteed uptime or yield claims.

Request a Samoa off-grid quotation · WhatsApp +86 159 8945 0735
What the EPC defines per site
| Point | Why it matters | Confirmed per project |
|---|---|---|
| 51.2V wall-mounted | houses, shops and small clinics | kWh and enclosure |
| 51.2V rack | larger plant rooms or several modules | module count and cabinet space |
| 25.6V | smaller 24V-class sites | ampere-hours and cabinet space |
| Autonomy hours or days | how long the essential load must run | hours or days recorded for that site |
| Arrays, inverters and civil works | not part of the kWh supply | LJY does not supply them |
The arithmetic is only a method: a rural clinic with a measured essential load of 600 W for 18 hours asks for about 10.8 kWh, plus losses and a reserve. A week of measured watts on that site is worth more than the array’s peak watts or a copied ampere-hour label.
What the EPC sends before a proposal
- Measured average watts of the essential loads, not only the array’s peak watts.
- Planned autonomy hours or days, including cyclone-season bad-weather days if they matter.
- System voltage and the planned enclosure, including salt-air exposure.
- Whether a diesel set stays for long spells.
- The landing port and the onward freight to the site.
Prove one site, then repeat the bank
EPCs who record the measured watts and the autonomy days on a first Upolu or Savai’i site, and then freeze that bank, can put the same design on later clinics or houses without guessing. Prices and lead times only in a quotation.

Request an off-grid quotation
Send the measured watts, the autonomy days and the landing port. We reply with a written offer, not with a guaranteed yield.
Send the measured watts and autonomy days
LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.