In Colombo, Kandy, Galle and Kurunegala, rooftop solar is common, and after the 2022 power cuts and the island-wide blackout of February 2025 more homes and shops ask installers to add storage on the 230 V 50 Hz grid. Each job tends to bring a different inverter. Anyone searching for LiFePO4 storage for installers in Sri Lanka needs one repeatable 51.2V SKU and an inverter check done per model and firmware, not an approval assumed from a 51.2V name. Shops with refrigeration and air-conditioning agree the backed-up circuits before sizing.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen; we are not a factory and we do not install. We coordinate 51.2V wall and rack modules with CAN or RS485. The protocol is confirmed per inverter model and firmware, and the documents are named in the offer.

Request a Sri Lanka installer offer · WhatsApp +86 159 8945 0735
What the installer fixes before the first job
| Point | Why it matters | Who confirms |
|---|---|---|
| 51.2V wall-mounted | houses and guesthouses | module count in the offer |
| 51.2V rack | shops and small offices | module count in the offer |
| Inverter protocol | CAN or RS485 per model and firmware | inverter documents and supplier |
| Energy | kWh from measured loads × backup hours | installer measurement |
| Documents | named in the offer | supplier |
A 51.2V name is not an approval. The protocol is confirmed per inverter model and firmware for every new inverter family the installer meets.
What the installer sends before a proposal
- Inverter brand, model and firmware.
- Measured loads and the backup hours wanted.
- Roof PV size and whether the system is grid-tied.
- Wall or rack mounting, and the room temperature.
- Documents the client or utility asks for.
One SKU across Sri Lanka jobs
Installers who keep one 51.2V SKU across houses and shops in Sri Lanka carry fewer spares and simplify service. Prices and lead times only in a quotation.

Request an installer offer
Send the inverter model and firmware and the measured loads. We reply with a 51.2V proposal and the points still to be confirmed.
LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.
