Across Kgalagadi, Kweneng and the Central District, cattle posts depend on boreholes, and many lodges and farms sit hours from the grid on sand tracks. Solar pumping and evening lights are moving off diesel, but winter nights in the Kalahari can fall below freezing while summer days are hot. An EPC searching for LiFePO4 storage for an off-grid cattle post in Botswana has to size the block from real daily energy, including the pump, and decide how the pack charges on a cold morning.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen, not a factory, and we do not design or build off-grid systems. We coordinate 25.6V and 51.2V banks and rack modules with BMS protection, plus a heated option. The inverter protocol, module count, heating logic and spare modules are confirmed per project. LiFePO4 must not be charged below 0 °C without heating, so cold Botswana winter mornings are planned for.

Request a storage quote for a Botswana cattle post · WhatsApp +86 159 8945 0735
What the EPC defines per site
| Item | Why it matters | Confirmed per project |
|---|---|---|
| 25.6V or 51.2V wall-mounted | daily load at the post or lodge | Ah and module count |
| Rack modules | service and spares | format and spare stock |
| Heated pack | charging on cold winter mornings | heating before charge |
| Inverter protocol | CAN or RS485 by model | model and checklist |
| Borehole pump | motor start current and daily hours | pump kW and hours |
We do not claim compatibility with a specific inverter; the EPC checks the protocol against the maker’s documents and, if needed, by a test. A pump is a motor load: its start current matters as much as its daily energy.
What the EPC collects before a quote
- Daily kWh, including borehole pump hours, and target autonomy.
- Inverter model and communication protocol.
- Winter low and summer high at the equipment room.
- Access time and spare-module plan.
- Number of posts or lodges in the first lot.
One proven block at the first post
EPCs that run one block at a first cattle post through a Kalahari winter, with the real pump load, keep the same parts list when the programme spreads to other districts. Prices and lead times only in a quotation.

How we proceed
Site and load data → storage proposal → first post → further posts. Prices, quantities and lead times only in the formal quote.