Edge AI puts GPU servers into a single cabinet at a factory, campus, shop or telecom site, far from a large data center. The cabinet needs a battery that bridges short outages, but it has little space and often no air-conditioned room. A small bank stores enough kWh yet cannot deliver the kW of the GPUs. For an edge AI cabinet battery, count modules by measured kW first, then check the minutes and the cabinet temperature.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen; we are not a factory. We supply 19-inch 51.2V rack battery modules only, not UPS units, racks or PDUs.

Rack module data
| Cells | LiFePO4, 16S × 3.2 V |
| Nominal voltage | 51.2 V |
| Module options | 100 Ah · 5.12 kWh · 3U / 200 Ah · 10.24 kWh · 4U |
| Max. continuous current (100 Ah module) | 100 A |
| Operating voltage range | 44.8–57.6 V |
| Communication | CAN, RS485, RS232 |
| Modules in parallel (max.) | 16 |
| Charge temperature | 0–50 °C |
| Discharge temperature | −20–55 °C |
Source: LJY 51.2V rack module page.
Worked example: one cabinet, power decides
Example: an edge AI cabinet draws 6 kW of measured IT load and must bridge 15 minutes. Energy: 6 kW × 15 ÷ 60 ÷ 0.92 ≈ 1.6 kWh, less than one module stores. Power: 6 kW ÷ 5.12 kW per module ≈ 1.2, so the cabinet needs 2 modules. Power, not energy, sets the module count, even for a short bridge.
What to send before a proposal
- Measured IT load of the cabinet in kW (GPU peak and average).
- Bridge minutes until the grid or a generator takes over.
- Lowest and highest temperature in the cabinet; LiFePO4 charges only between 0 and 50 °C, so heating or cooling is confirmed per project.
- Free rack units (U) and the battery input window of the UPS or inverter.
- BMS communication needed (CAN or RS485) and remote monitoring needs.
Request a sizing
Send the cabinet kW, the bridge minutes and the temperature range; we reply with a module count checked for kW, kWh and temperature. Prices and lead times only in a quotation.