On construction sites and at events in Cape Town and Johannesburg, a diesel generator often runs for hours to carry a few kilowatts of tools, towers, catering or welfare cabins. Fuel is expensive, noise is an issue near housing, and load shedding can take the grid away just when a unit needs a recharge. A hire firm looking at a battery power unit with LiFePO4 for construction hire in South Africa first has to turn its load into kilowatt-hours, including the hours of a typical shedding window.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen, not a factory, and we do not build trailers, inverters or generators. We coordinate 51.2V modules and custom packs for unit builders. A generator is rated in kVA, which is power; a battery stores energy in kWh. The module count comes from the average load multiplied by the hours the unit must run between charges, including a load-shedding window on a hire job.

Request a module quote for a South African hire unit · WhatsApp +86 159 8945 0735
Power versus energy
| Question | Example arithmetic | Confirmed per project |
|---|---|---|
| Average load on a site | 5 kW × 8 h = 40 kWh | from a logged hire job |
| Load-shedding window | hours the unit must run off-grid | stage and site schedule |
| Peak load | tools, towers, compressors | inverter rating, not battery size |
| 51.2V 200Ah rack module | 10.24 kWh per module | module count and inverter protocol |
The example is arithmetic only. Logging a real job with a power meter, including a shedding window, gives far better sizing than the generator’s nameplate.
What the hire firm sends before a quote
- Load log from a typical job, or peak and average kW per day.
- Hours the unit must run before recharging, including a shedding window.
- Inverter or power-conversion system chosen by the unit builder.
- Enclosure size, weight limit and how the unit is moved on site.
- UN38.3 and SDS for the chosen modules come with the quote; transport as dangerous goods follows the IMDG Code.
Build one unit, log a season
Hire firms that build one unit, run it through a Cape Town or Johannesburg season, then fix the module count, repeat the same design across the fleet with fewer surprises. Prices and lead times only in a quotation.

How we proceed
Load log and inverter choice → module proposal → first unit → fleet units. Prices and lead times only in the formal quote.
Send your load log and request a module proposal
LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.
