LiFePO4 batteries for bangus, tilapia and shrimp pond aerators

Bangus, tilapia and shrimp ponds across Pangasinan, Laguna, Iloilo, Pampanga and Mindanao need aerators at night, when oxygen falls, and a hot-night outage can kill a crop. Diesel sets are expensive to run on every pond. An operator searching for a LiFePO4 battery for pond aerators in the Philippines has to turn aerator input power and night hours into kilowatt-hours, instead of copying the motor nameplate.

LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen, not a factory, and we do not install or run farms. We coordinate 12.8V, 25.6V and 51.2V banks. The module count comes from the aerator’s measured input power multiplied by the night hours and the outage hours, with a margin the operator agrees. The inverter or DC drive, and an enclosure for humidity and splash, are confirmed per site.

The brackishwater aquaculture station at Dumangas, Iloilo, a site of the kind that uses aerators at night
Photo: RDBD86, Wikimedia Commons, CC BY-SA 4.0 (resized, WebP). Illustration, not an LJY product.

Request an aerator-bank quote for a Philippine pond · WhatsApp +86 159 8945 0735

What the operator defines per pond

ItemWhy it mattersConfirmed per project
12.8V or 25.6Vsmall paddle-wheels and hatchery blowerscurrent and enclosure
51.2V wall-mounted or rackseveral aerators on one bankkWh and module count
Night and outage hoursoxygen falls after darklogged or estimated hours
Inverter or starteraerators are motor loads with start currentmodel and surge
Humidity and splashopen ponds and brackish waterenclosure and placement

The arithmetic is only a method: a 1.1 kW aerator running 8 hours needs about 8.8 kWh plus losses and a reserve. A logged night at the pond is a better number than the nameplate alone.

What the operator sends before a quote

  • Aerator type, input power and how many units share a bank.
  • Hours of night aeration and typical outage hours.
  • Inverter or starter already used, if any.
  • Number of ponds in the first installation.
  • UN38.3 and SDS for the chosen modules come with the quote.

Prove one pond through a hot month

Operators who run one pond through a hot month with real outages, then freeze the module count, repeat the same bank on neighbouring ponds without guessing. Prices and lead times only in a quotation.

The freshwater aquaculture station at Binangonan, Rizal, on Laguna de Bay
Photo: RDBD86, Wikimedia Commons, CC BY-SA 4.0 (resized, WebP). Illustration, not an LJY product.

How we proceed

Aerator load and hours → bank proposal → first pond → further ponds. Prices, quantities and lead times only in the formal quote.

Send your aerator data and request a proposal

LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.