A bank branch or a retail store runs on a small server room: one or two racks holding the branch server, the point-of-sale controller, the network switch and the CCTV recorder. When the mains fails, that rack must stay up, long enough for the generator to start, or for a graceful shutdown that does not corrupt the day’s transactions. In most branches the weak point is not the UPS, it is the VRLA battery strings inside it: three to five years of life, capacity fading in a warm back room, and a replacement bill every few years. A 51.2 V LiFePO4 rack battery bank replaces those strings with modules that last longer, hold their capacity and weigh far less. Start with the modules one rack needs today and add more in parallel as the branch grows, without replacing what is already installed. This page explains how to size a rack battery bank for a bank branch or retail store UPS, what to check before ordering, and what to send LJY Energy for a sizing proposal.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen; we are not a factory. We supply 19-inch 51.2V rack battery modules only, not UPS units, racks or PDUs.

Rack module data
| Cells | LiFePO4, 16S × 3.2 V |
| Nominal voltage | 51.2 V |
| Module options | 100 Ah · 5.12 kWh · 3U / 200 Ah · 10.24 kWh · 4U |
| Max. continuous current (100 Ah module) | 100 A |
| Operating voltage range | 44.8–57.6 V |
| Communication | CAN, RS485, RS232 |
| Modules in parallel (max.) | 16 |
| Charge temperature | 0–50 °C |
| Discharge temperature | −20–55 °C |
Source: LJY 51.2V rack module page.
Worked example: one branch rack, current decides
Example: a branch rack draws 6 kW of measured IT load and must bridge 45 minutes. Energy: 6 kW × 45 ÷ 60 ÷ 0.92 ≈ 5 kWh, less than one 100 Ah module stores. Current: 6 kW ÷ 51.2 V ≈ 117 A, more than one 100 Ah module’s 100 A continuous rating, so the rack needs 2 modules in parallel. Current, not energy, sets the module count here. If the branch adds load later, more modules join the same bank in parallel; the first modules stay in service.
What to send before a proposal
- Measured IT load of the branch rack in kW (server, POS controller, network and CCTV together).
- Bridge minutes required: until the generator starts, or until a graceful shutdown finishes.
- Available rack space in U and the UPS model with its battery input voltage window.
- Whether the UPS expects VRLA strings today, and the BMS communication needed (CAN or RS485).
Request a sizing
Send the rack load in kW, the bridge minutes you need, the rack space available in U, and the UPS model and its battery input voltage. LJY Energy will confirm the module count, the parallel layout and the communication setup, then quote the bank with delivery terms. We coordinate OEM/ODM battery supply from Shenzhen; we are not a factory, and every order is confirmed in writing before production.