Around Harare and in Mashonaland, a broiler or layer house has to keep the tunnel fans, the cooling-pad pump and the house controllers running when load-shedding hits, especially in heat. Many farms leave a diesel genset running for every short window, or they lose airflow when the power goes. Anyone searching for a LiFePO4 poultry house ventilation battery in Zimbabwe needs to turn the measured watts of the fans, the pad pump and the controllers, and the typical load-shedding or peak-heat hours, into kWh — not copy the shed’s installed kW nameplate, and not copy a generic shop or clinic backup page for Harare. This page is about the bank behind the house. It is not a pond-aerator page, and it is not a general load-shedding page for shops.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen; we are not a factory, we do not make fans, cooling pads, controllers or houses, and we do not run farms. We coordinate 25.6V and 51.2V banks, with a heated option where charging may fall below 0 °C. An existing genset, if the farm already has one, stays for longer outages; starter or genset batteries stay separate. Enclosure, fusing, dust and ammonia exposure are confirmed per house. We do not publish guaranteed uptime, mortality or yield claims.

Request a Zimbabwe poultry-house quotation · WhatsApp +86 159 8945 0735
What the farm defines per house
| Point | Why it matters | Confirmed per project |
|---|---|---|
| 51.2V wall-mounted | several tunnel fans plus a pad pump and controllers | kWh and module count |
| 51.2V rack | larger houses or a plant room | module count and cabinet space |
| 25.6V | smaller houses on a 24V class | ampere-hours and cabinet space |
| Load-shedding or peak-heat hours | how long the essential load must run | hours recorded on that house |
| Fans, pads, controllers and houses | not part of the kWh supply | LJY does not supply them |
The arithmetic is only a method: six tunnel fans at a measured average of 550 W, plus 300 W for the pad pump and 100 W for the controllers, for four hours of load-shedding, asks for about 14.8 kWh, plus losses and a reserve. A week of measured watts on that Harare-belt house is worth more than the shed’s installed kW.
What the operator sends before a proposal
- Measured average watts of the tunnel fans, the cooling-pad pump and the house controllers, not only the shed’s installed kW.
- Typical load-shedding or peak-heat hours on that Mashonaland or Harare-belt house.
- System voltage and the space in a plant room or an outdoor cabinet.
- Whether a genset stays as long-outage backup.
- Dust, ammonia, enclosure and heat on that house.
Prove one house, then repeat the bank
Operators who record the measured watts and the load-shedding hours on a first house, and then freeze that bank, can put the same design on later houses without guessing. Prices and lead times only in a quotation.

Request a poultry-house quotation
Send the measured watts, the load-shedding hours and the system voltage. We reply with a written offer, not with a mortality or uptime guarantee.
Send the measured watts and hours
LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.