In Port Vila and on nearby islands, solar installers are often asked to add a storage module to a house, a shop or a small lodge, and then to repeat that SKU on the next roofs. Anyone searching for LiFePO4 storage for solar installers in Vanuatu needs a documented 51.2V wall or rack module, and must confirm the charge window and the CAN or RS485 port on that inverter model — not copy a protocol name from a list. This page is about that repeatable module. It is not a utility-storage page and it is not a page for a single off-grid camp.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen; we are not a factory and we do not install in Vanuatu. We coordinate 51.2V wall-mounted and rack modules. The charge window and the communication port are confirmed per inverter model and firmware. We do not publish a compatibility verdict.

Request a storage proposal for installers in Port Vila · WhatsApp +86 159 8945 0735
What the installer defines per roof
| Point | Why it matters | Confirmed per project |
|---|---|---|
| 51.2V wall-mounted | many houses and shops | kWh and wall space |
| 51.2V rack | plant rooms or several modules | module count and cabinet space |
| Inverter protocol | CAN or RS485, and the charge window | confirmed per inverter model and firmware |
| Daily energy | how much the house or shop actually uses | measured kWh or watts × hours |
| Installation | not part of the supply | LJY does not install on site |
A 51.2V name is not an approval of any inverter. The installer confirms the window and the intended port on the first Port Vila roof, then freezes that SKU for later jobs.
What the installer sends before a proposal
- Inverter model and firmware version.
- Whether the cable is intended for CAN or for RS485.
- Measured daily kWh, or watts and hours, of the house or shop.
- Wall or cabinet space for the module.
- How many roofs are expected to share the same SKU after the first job.
Prove one roof, then repeat the SKU
Installers who record the protocol on a first Port Vila roof, and then freeze the module, can put the same SKU on later houses and shops without guessing. Prices and lead times only in a quotation.

How we proceed
Inverter model and site list → module proposal → first roof → later jobs. Prices, quantities and lead times only in the formal offer.
Send the inverter model and the first roofs and request a proposal
LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.
