On the Abeokuta–Ibadan belt in Ogun and Oyo, a broiler or layer house has to keep the tunnel fans, the cooling-pad pump and the house controllers running when the grid drops, especially in heat. Many farms leave a diesel genset running for every short cut, or they lose airflow when the power goes. Anyone searching for a LiFePO4 poultry house ventilation battery in Nigeria needs to turn the measured watts of the fans, the pad pump and the controllers, and the typical outage or peak-heat hours, into kWh — not copy the shed’s installed kW nameplate or a neighbour’s ampere-hour figure. This page is about the bank behind the house. It is not a pond-aerator page, it is not a solar cold-room page, and it is not a generic shop or clinic backup page.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen; we are not a factory, we do not make fans, cooling pads, controllers or houses, and we do not run farms. We coordinate 25.6V and 51.2V banks, with a heated option where charging may fall below 0 °C. An existing genset, if the farm already has one, stays for longer outages; starter or genset batteries stay separate. Enclosure, fusing, dust and ammonia exposure are confirmed per house. We do not publish guaranteed uptime, mortality or yield claims.

Request a bank proposal for poultry-house ventilation in Nigeria · WhatsApp +86 159 8945 0735
What the farm defines per house
| Point | Why it matters | Confirmed per project |
|---|---|---|
| 51.2V wall-mounted | several tunnel fans plus a pad pump and controllers | kWh and module count |
| 51.2V rack | larger houses or a plant room | module count and cabinet space |
| 25.6V | smaller houses on a 24V class | ampere-hours and cabinet space |
| Outage or peak-heat hours | how long the essential load must run | hours recorded on that house |
| Fans, pads, controllers and houses | not part of the kWh supply | LJY does not supply them |
The arithmetic is only a method: six tunnel fans at a measured average of 550 W, plus 300 W for the pad pump and 100 W for the controllers, for four hours, asks for about 14.8 kWh, plus losses and a reserve. A week of measured watts on that house is worth more than the shed’s installed kW or a copied ampere-hour label.
What the operator sends before a proposal
- Measured average watts of the tunnel fans, the cooling-pad pump and the house controllers, not only the shed’s installed kW.
- Typical outage or peak-heat hours on that Ogun or Oyo house.
- System voltage and the space in a plant room or an outdoor cabinet.
- Whether a genset already exists and should stay for longer outages.
- Dust, ammonia, heat and whether charging may fall below 0 °C.
Prove one house, then repeat the bank
Integrators and farm groups that instrument one Abeokuta or Ibadan house, with real outage or peak-heat hours, and then freeze the module count, can roll the same bank out across later houses without guessing. Prices and lead times only in a quotation.

How we proceed
Measured essential load and outage or peak-heat hours → bank proposal → first house → later houses. Prices, quantities and lead times only in the formal offer.
Send the fan load and outage hours and request a proposal
LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.
