In Suva, in Nadi and on other islands, solar installers often need one storage module they can repeat from house to shop without reinventing the settings each time. Anyone searching for LiFePO4 storage for solar installers in Fiji needs a short 51.2V line and a written inverter protocol, plus a clear view of shipping between islands and of access in the cyclone season. This page is for that repeatable storage SKU, not for a single off-grid lodge designed as a mini-grid.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen, not a factory, and we do not install in Fiji. We coordinate 51.2V wall-mounted and rack modules, and 25.6V where a 24V class is required. The inverter protocol is confirmed per project. UN38.3 and SDS travel with each model. Island shipping and enclosure are confirmed per job. Terms appear only in the quotation.

Request a storage proposal for solar installers in Fiji · WhatsApp +86 159 8945 0735
What the installer freezes as a SKU
| Point | Why it matters | Confirmed per project |
|---|---|---|
| 51.2V wall-mounted | houses and shops with a hybrid inverter | inverter protocol |
| 51.2V rack | larger rooms and shops | module count |
| 25.6V | sites that stay on a 24V class | ampere-hours and heating |
| Inverter protocol | so the same SKU can be repeated | model and firmware, in writing |
| Island shipping and enclosure | access and weather on that island | forwarder and cabinet |
A short line that has been proven on a first Suva or Nadi roof is easier to repeat than a long catalogue. The protocol is confirmed per inverter model and firmware.
What the installer sends before a proposal
- Inverter model and firmware for the first jobs.
- Whether the first sites need a wall module or a rack.
- How many houses or shops are planned after the first installation.
- Which island the first container or pallet should reach.
- Whether access is limited in the cyclone season.
Prove one roof, then repeat the SKU
Installers who record the protocol on a first Suva or Nadi job, and then freeze the module, can repeat the same SKU across later houses and shops without guessing. Prices and lead times only in a quotation.

How we proceed
Inverter model and site list → module proposal → first job → later roofs. Prices, quantities and lead times only in the formal offer.
Send the inverter model and the first sites and request a proposal
LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.
