Around Juba and in the states, clinics, compounds and small settlements often have no reliable grid. A diesel set covers some hours, but the storage block has to be sized from the measured loads and the autonomy the site actually needs. Anyone searching for LiFePO4 storage for off-grid sites around Juba should work in kWh, not copy the generator’s kVA. This page is for that storage block. LJY does not design or build mini-grids.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen, not a factory, and we do not install in South Sudan. We coordinate 25.6V and 51.2V banks and rack modules. The inverter protocol is confirmed per project. Heating is confirmed where charging may fall below 0 °C. We do not publish guaranteed autonomy claims. Terms are written only in the quotation.

Request a storage proposal for off-grid sites around Juba · WhatsApp +86 159 8945 0735
What the EPC defines per site
| Point | Why it matters | Confirmed per project |
|---|---|---|
| 25.6V | smaller compounds and clinics | kWh and heating |
| 51.2V wall-mounted | sites with a hybrid inverter | module count and protocol |
| 51.2V rack | larger blocks and shared rooms | module count |
| Autonomy hours | the real night and reserve, not the kVA plate | hours agreed for that site |
| Inverter family | protocol is not inferred from a 51.2V name | confirmed per inverter model and firmware |
The arithmetic is only a method: 1.2 kW of measured essential load for 12 hours asks for about 14.4 kWh, plus losses and a reserve. A load log from that clinic is worth more than a 20 kVA generator plate.
What the EPC sends before a proposal
- Measured or logged essential loads, not only the generator kVA.
- Autonomy hours and how many sites should share one block design.
- The inverter family and firmware, if already chosen.
- Minimum temperature and whether heating is required for charging.
- Access, enclosure and who will install on site.
Freeze one block design, then repeat it
EPCs who instrument a first clinic or compound around Juba, with a real load log, and then freeze the module count, can repeat the same block at neighbouring sites. Prices and lead times only in a quotation.

How we proceed
Loads and autonomy → storage proposal → first site → neighbouring sites. Terms only in the formal offer. We do not design the mini-grid.
Send the load log and autonomy hours and request a proposal
LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.
