Bangus, tilapia and shrimp ponds across Pangasinan, Laguna, Iloilo, Pampanga and Mindanao need aerators at night, when oxygen falls, and a hot-night outage can kill a crop. Diesel sets are expensive to run on every pond. An operator searching for a LiFePO4 battery for pond aerators in the Philippines has to turn aerator input power and night hours into kilowatt-hours, instead of copying the motor nameplate.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen, not a factory, and we do not install or run farms. We coordinate 12.8V, 25.6V and 51.2V banks. The module count comes from the aerator’s measured input power multiplied by the night hours and the outage hours, with a margin the operator agrees. The inverter or DC drive, and an enclosure for humidity and splash, are confirmed per site.

Request an aerator-bank quote for a Philippine pond · WhatsApp +86 159 8945 0735
What the operator defines per pond
| Item | Why it matters | Confirmed per project |
|---|---|---|
| 12.8V or 25.6V | small paddle-wheels and hatchery blowers | current and enclosure |
| 51.2V wall-mounted or rack | several aerators on one bank | kWh and module count |
| Night and outage hours | oxygen falls after dark | logged or estimated hours |
| Inverter or starter | aerators are motor loads with start current | model and surge |
| Humidity and splash | open ponds and brackish water | enclosure and placement |
The arithmetic is only a method: a 1.1 kW aerator running 8 hours needs about 8.8 kWh plus losses and a reserve. A logged night at the pond is a better number than the nameplate alone.
What the operator sends before a quote
- Aerator type, input power and how many units share a bank.
- Hours of night aeration and typical outage hours.
- Inverter or starter already used, if any.
- Number of ponds in the first installation.
- UN38.3 and SDS for the chosen modules come with the quote.
Prove one pond through a hot month
Operators who run one pond through a hot month with real outages, then freeze the module count, repeat the same bank on neighbouring ponds without guessing. Prices and lead times only in a quotation.

How we proceed
Aerator load and hours → bank proposal → first pond → further ponds. Prices, quantities and lead times only in the formal quote.
Send your aerator data and request a proposal
LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.
