LiFePO4 batteries for solar aerators on Nigerian fish farms

Catfish and tilapia ponds around Ilorin, Ibadan and in the Niger Delta need moving, aerated water through the night. When the grid drops, as it often does, a paddle-wheel or blower that stops for a few hours can kill a pond. Farmers who have relied on diesel to keep the aerators turning now ask for a battery. Anyone searching for a solar aerator battery for a Nigerian catfish or tilapia farm has to turn the aerator’s input power into kilowatt-hours, not just copy the motor’s kW nameplate.

LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen, not a factory, and we do not install or run farms. We coordinate 12.8V, 25.6V and 51.2V banks. The module count comes from the aerator’s measured or nameplate input power multiplied by the hours of darkness and by the hours of a typical outage, with a margin the farm agrees. The inverter or DC drive, and protection from heat and splash, are confirmed per project.

A fish pond near Ilorin in Nigeria, of the kind that needs aeration at night
Photo: Habeebchomsky, Wikimedia Commons, CC BY-SA 4.0 (resized, WebP). Illustration, not an LJY product.

Request an aerator-bank quote for a Nigerian farm · WhatsApp +86 159 8945 0735

What the farm defines per pond

ItemWhy it mattersConfirmed per project
12.8V or 25.6Vsmaller blowers and farm workshopscurrent and enclosure
51.2V wall-mounted or rackseveral aerators on one bankkWh and module count
Night and outage hoursoxygen must not drop while the grid is awaylogged or estimated hours
Inverter or starterthe aerator is a motor load, with a start currentmodel and surge
Heat and splashopen ponds in Nigerian heatenclosure and placement

The example arithmetic is only a method: a 1.1 kW aerator running 10 hours needs about 11 kWh plus losses and a reserve. A logged night on the farm is a better number than the nameplate alone.

What the operator sends before a quote

  • Aerator type, input power and how many units share a bank.
  • Hours the aerators must run at night, and typical outage hours.
  • Inverter or starter already chosen, if any.
  • Number of ponds in the first installation and later.
  • UN38.3 and SDS for the chosen modules come with the quote.

Prove one pond, then repeat the bank

Farms that run one pond through a hot week of real outages, then freeze the module count, repeat the same bank on the next ponds without guessing again. Prices and lead times only in a quotation.

Another fish pond beside the river in Kwara State, Nigeria
Photo: Habeebchomsky, Wikimedia Commons, CC BY-SA 4.0 (resized, WebP). Illustration, not an LJY product.

How we proceed

Aerator load and hours → bank proposal → first pond → repeat ponds. Prices, quantities and lead times only in the formal quote.

Send your aerator data and request a proposal

LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.