Uganda’s tower portfolios run from grid-connected sites in Kampala and other towns, where interruptions are part of normal operation, to hybrid sites in the north and west that depend on diesel and solar. A towerco or O&M contractor looking for a telecom BTS battery in Uganda wants fewer battery replacements and fewer generator hours, and a module that can be repeated across hundreds of sites once a pilot cluster proves it.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen; we are not a factory. We supply 48.0 V 15S telecom modules in 50 Ah and 100 Ah with RS485 or CAN. Charge window, protocol and cabinet fit are confirmed per project with the site controller. Installation and maintenance stay with the integrator. We claim no UCC or UNBS approval for batteries.

Request an offer for BTS sites in Uganda · WhatsApp +86 159 8945 0735
Reference modules for a BTS site
| Module | Reference energy | Points confirmed per project |
|---|---|---|
| 48.0 V 15S 50 Ah | 2.40 kWh | 19-inch rack, 2U/3U class; charge around 54.75 V, confirmed per controller |
| 48.0 V 15S 100 Ah | 4.80 kWh class (see the 100 Ah option) | sites that need more autonomy in the same 15S family |
15S (48.0 V) matches the telecom bus; 16S (51.2 V) is a separate solar family and is not swapped in as-is. Real autonomy depends on site load and target hours, confirmed per project.
What the integrator should close
- Rectifier or hybrid controller make and model, and the float voltage actually set.
- Site load in watts and battery hours targeted between grid returns or generator starts.
- Cabinet space, ventilation and anti-theft measures at rural sites.
- RS485 or CAN protocol and the alarms sent to the NOC.
- UN38.3 and SDS for the chosen model come with the quotation; import via Mombasa or Dar es Salaam and clearance stay with the importer.
From pilot cluster to portfolio
Portfolios that prove one module on a pilot cluster and then roll it out keep one spare-parts list and one training plan for field teams. Prices and lead times appear only in the quotation.

How we proceed
Controller, site load, autonomy, cabinet and site count → module proposal → pilot sites → repeated rollout. Prices and lead times only in the quotation.
Request a telecom battery offer for Uganda
LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.
