Telecom BTS batteries in Nigeria: 48 V 15S LiFePO4 for diesel-hybrid sites

Across Lagos, Abuja, the Niger Delta and the northern states, many BTS sites still lean on a diesel generator for long hours because grid supply is unreliable, and lead-acid banks are both short-lived in the heat and a target for theft. A tower company or O&M contractor looking for a telecom BTS battery in Nigeria usually wants fewer generator hours and fewer battery swaps, then the same module across a whole cluster. This page is about that site battery, not a home inverter and not our general Nigeria supplier page.

LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen; we are not a factory. We supply 48.0 V telecom modules in 15S, 50 Ah and 100 Ah, with RS485 or CAN. Charge window, protocol and cabinet fit are confirmed per project against the site controller. Installation and maintenance stay with the integrator. We claim no NCC approval and no SON or SONCAP mark; if a shipment needs SONCAP, it is arranged per order on the importer side.

Lagos Island cityscape, illustration of a Nigerian network area
Photo: Jamie Tubers, Wikimedia Commons, CC BY-SA 4.0 (resized, WebP). Illustration, not an LJY product.

Request an offer for BTS sites in Nigeria · WhatsApp +86 159 8945 0735

Reference modules for a BTS site

ModuleReference energyNotes to confirm per project
48.0 V 15S 50 Ah2.40 kWh19-inch rack, 2U/3U class; charge around 54.75 V, confirmed per controller
48.0 V 15S 100 Ah4.80 kWh class (see the 100 Ah option)sites that need more autonomy in the same 15S family

15S (48.0 V) is the telecom bus commonly used on BTS sites; 16S (51.2 V) is the solar family and is not a drop-in substitute. Real autonomy = site load × target hours, confirmed per project. No Nigerian product mark is claimed.

What the integrator should close first

  • Rectifier or hybrid-controller make and model, and the float voltage actually set on site.
  • Average site load in watts and the hours on battery wanted between generator starts.
  • Cabinet space, ventilation and ambient temperature; on hot sites the operating window is confirmed per project.
  • Communication protocol (RS485 or CAN) and which alarms go to the NOC.
  • Theft mitigation is a site-design topic; we can discuss enclosure and mounting options, but do not promise a security outcome.
  • UN38.3 and SDS for the chosen model come with the quotation; clearance and SONCAP, where needed, stay with the importer.

From pilot sites to a cluster

Portfolios that prove a handful of sites first and then roll the same module across a cluster keep one spare reference and one training pack. Prices and lead times appear only in the quotation.

Skyline at Mafoluku, Oshodi in Lagos, illustration of dense urban coverage
Photo: Canih28, Wikimedia Commons, CC BY-SA 4.0 (resized, WebP). Illustration, not an LJY product.

How we proceed

Controller, site load, target autonomy, cabinet and site count → module proposal → pilot sites → repeat rollout. Prices and lead times only in the quotation.

Request a telecom-battery offer for Nigeria

LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.