The SYNK-3.6K-SG04LP1 and the SYNK-5K-SG04LP1 are single-phase hybrid inverters in the Sunsynk SG04LP1 family. Anyone searching for a Sunsynk SYNK-3.6K 5K-SG04LP1 CAN RS485 checklist needs the official battery-voltage window, the current limit by model and the ports, not a compatibility verdict inferred from a 51.2V name or copied from a Sunsynk SG03LP1 sheet or from a Deye SUN-SG03LP1 or SUN-SG04LP3 row. The official range is 40–60 V; 60 V is confirmed per project.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen, not a factory, and we do not claim to supply Sunsynk products. This page quotes the official Sunsynk single-phase 3.6/5 kW SG04LP1 support datasheet only. A 51.2V name is not an approval. We do not publish a compatibility verdict. Protocol and the charge window are confirmed per inverter model and firmware. The 40–60 V window includes 60 V, which is confirmed per project.

Request a battery checklist for a Sunsynk SG04LP1 job · WhatsApp +86 159 8945 0735
Facts taken from the official SG04LP1 support datasheet
| Point | What the document states | The installer still confirms |
|---|---|---|
| Models | SYNK-3.6K-SG04LP1 and SYNK-5K-SG04LP1 | the nameplate of the unit on site |
| Battery type | Lead-acid or Lithium-ion | the chemistry of the pack on site |
| Voltage range | 40–60 V (60 V confirmed per project) | charge end of the pack against this window; 60 V confirmed per project |
| Current | maximum charge/discharge 90 A (3.6K) or 120 A (5K) | the limit of this model and of the pack |
| Ports and strategy | RS485 and CAN; Li-ion charging is self-adaptation to the BMS | one intended method, taken from the inverter documentation |
| Other families | this series is not the Sunsynk SG03LP1 sheet and not Deye SUN-SG03LP1 / SUN-SG04LP3 | do not copy figures from those rows |
| Verdict | none is published on this page; a 51.2V name is not an approval | protocol and window confirmed per model and firmware; 60 V confirmed per project |
A 51.2V name is not an approval. The official window is 40–60 V; 60 V is confirmed per project. Do not copy figures from the Sunsynk SG03LP1 datasheet or from Deye SUN-SG03LP1 or SUN-SG04LP3 rows into this checklist.
What the installer sends before a proposal
- Inverter model (SYNK-3.6K-SG04LP1 or SYNK-5K-SG04LP1) and firmware version.
- Pack voltage, series count and BMS.
- The charge-voltage limit planned, against the 40–60 V window (60 V confirmed per project).
- Whether the cable is intended for CAN or for RS485.
- Written confirmation from the battery supplier, if available.
Treat the SG04LP1 as its own datasheet
Installers who record the window, the current limit for that 3.6K or 5K unit and the intended port on a first job, rather than copying figures from an SG03LP1 or Deye sheet, avoid a silent mismatch after several rooms are already wired. The official window is 40–60 V; 60 V is confirmed per project. Prices and lead times only in a quotation.

How we proceed
Inverter model, pack data and port → checklist against the official SG04LP1 datasheet → first test → later jobs. Prices and lead times only in the formal quote. We do not publish a compatibility verdict. 60 V is confirmed per project.
Send the inverter model and pack data and request a checklist
LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.