Solar CCTV and beacon batteries for Philippine LGU roads

Provincial and city roads under Philippine LGUs increasingly carry solar cameras and flashing beacons where the grid is thin or the pole is far from a feeder. The camera has to record all night, the beacon has to flash through a storm, and a short pack leaves a dark stretch of road. Anyone searching for a solar CCTV or beacon battery for a Philippine LGU road should start from the measured watts of the camera, the infrared, the radio and the beacon, not from a capacity copied from another pole.

LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen, not a factory, and we do not install cameras or beacons. We coordinate 12.8V and 25.6V packs. Capacity comes from measured watts times 24 hours times the days of autonomy the LGU wants. The enclosure, typhoon-season rain and any communication protocol are confirmed per project.

The Bukidnon–Davao road at Calinan, a provincial road of the type now fitted with solar cameras and beacons
Photo: Patrickroque01, Wikimedia Commons, CC BY-SA 4.0 (resized, WebP). Illustration, not an LJY product.

Request a solar CCTV pack quote for a Philippine LGU road · WhatsApp +86 159 8945 0735

What the LGU or contractor defines per pole

ItemWhy it mattersConfirmed per project
12.8Vsingle cameras or beaconsAh and enclosure
25.6Va pole with a camera and a radio, or several beaconskWh and module count
Measured watts × 24 hthe pole must not go dark at nighta measurement on the pole, not a catalogue figure
Autonomydays the pole must run after poor sun or a stormdays requested
Rain and windtyphoon seasonIP rating and mounting

A 24-hour measurement on one pole, including the infrared at night, is a better basis than a generic watts-to-amp-hours table.

What the LGU or contractor sends before a quote

  • Measured or estimated watts of the camera, infrared, radio and beacon.
  • Days of autonomy and the worst month of sun.
  • Enclosure and mounting planned for rain and wind.
  • Number of poles in the first road section and later.
  • UN38.3 and SDS for the model come with the quote.

Measure one pole, then repeat it

LGUs that measure one pole for a full day and night, then freeze the pack, avoid dark stretches when the programme moves to the next road. Prices and lead times only in a quotation.

The coastal road in Davao City, another corridor where LGUs add solar cameras
Photo: Teemu Väisänen, Wikimedia Commons, CC BY-SA 4.0 (resized, WebP). Illustration, not an LJY product.

How we proceed

Measured load and autonomy → pack proposal → first poles → repeat sections. Prices and lead times only in the formal quote.

Send the measured load and request a proposal

LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.