On the Nairobi–Mombasa highway and on urban corridors in Nairobi, LED advertising faces often have to stay on all night, on stretches where the grid is weak or missing. Diesel sets and undersized batteries leave the face dark or keep a generator running until morning. Anyone searching for a LiFePO4 solar LED billboard battery in Kenya needs to turn the measured watts of the face and the controller, and the night hours, into kWh — not copy the array’s watt-peak or a neighbour’s ampere-hour figure. This page is about the bank behind an advertising face. It is not a municipal solar street-light page, not a solar CCTV or signal page, and not the Nigeria billboard page.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen; we are not a factory, we do not make LED faces, unipoles or media structures, and we do not sell advertising slots. We coordinate 12.8V, 25.6V and 51.2V banks, with a heated option where charging may fall below 0 °C. Enclosure, fusing and theft protection are confirmed per site. We do not publish guaranteed fuel-hour or brightness claims.

Request a bank proposal for solar LED billboards in Kenya · WhatsApp +86 159 8945 0735
What the media owner defines per face
| Point | Why it matters | Confirmed per project |
|---|---|---|
| 51.2V wall-mounted | higher-power faces and controllers | kWh and module count |
| 25.6V | medium faces on a 24V class | ampere-hours and cabinet space |
| 12.8V | smaller faces or controller-only loads | ampere-hours and autonomy days |
| Night hours and autonomy | how long the face must stay on | measured hours, plus reserve days |
| Face, structure, media slot | not part of the kWh calculation | LJY does not supply them |
The arithmetic is only a method: an 800 W face plus a 50 W controller for 12 hours asks for about 10.2 kWh, plus losses and one or two days of reserve. A night of measured watts on that face is worth more than the array’s watt-peak or a copied ampere-hour label.
What the operator sends before a proposal
- Measured average watts of the face and the controller, not only the panel watt-peak.
- Typical night hours and how many autonomy days the site requires.
- System voltage and the space in the cabinet or the base.
- Theft, heat and whether charging may fall below 0 °C.
- Whether the face is already on a diesel set that should stay as a backup only.
Prove one face on a corridor, then repeat the bank
Operators who instrument one face on the Nairobi–Mombasa corridor, with real night hours, and then freeze the module count, can roll the same bank out along the route without guessing. Prices and lead times only in a quotation.

How we proceed
Measured face load and night hours → bank proposal → first face → later sites. Prices, quantities and lead times only in the formal offer.
Send the face load and night hours and request a proposal
LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.