Around Dar es Salaam, on the coast, around Mwanza and on inland ponds, aerators have to run through the night. A power cut or a diesel set that is switched off can kill stock before morning. Anyone searching for a LiFePO4 aerator battery for Tanzania fish farms needs to turn the aerator’s measured input watts, and the night hours, into kWh — not copy the motor nameplate in kW. This page is about the bank behind the aerators on a farm. It is not a village mini-grid page for an EPC that splits irrigation, milling and household loads, and it is not a solar cold-room page.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen; we are not a factory, we do not install aerators and we do not run farms. We coordinate 12.8V, 25.6V and 51.2V banks. Charge comes from a charger, a hybrid controller or a generator as specified per farm. Humidity, salt spray and cabinet placement are confirmed per site. We do not publish guaranteed survival or oxygen claims.

Request a bank proposal for fish-farm aerators in Tanzania · WhatsApp +86 159 8945 0735
What the farm defines per pond
| Point | Why it matters | Confirmed per project |
|---|---|---|
| 51.2V wall-mounted | several aerators on one bank | kWh and module count |
| 25.6V | medium ponds on a 24V class | ampere-hours and cabinet space |
| 12.8V | a single small aerator | ampere-hours and autonomy hours |
| Night hours | how long the aerators must run | hours recorded on that pond |
| Aerators and farm works | not part of the kWh supply | LJY does not supply or install them |
The arithmetic is only a method: two aerators at a measured input of 400 W each for 10 hours ask for about 8 kWh, plus losses and a reserve. A night measured on that pond is worth more than two 1.5 kW nameplates.
What the farm sends before a proposal
- Measured input watts of each aerator, not only the motor nameplate in kW.
- Typical night hours and how many units share one bank.
- System voltage and the space for a cabinet, including salt spray and heat.
- Whether a generator or a hybrid controller already charges the bank.
- Whether neighbouring ponds should repeat the same design later.
Prove one pond, then repeat the bank
Farms that instrument one pond, with real night hours, and then freeze the bank size, can roll the same design out to neighbouring ponds without guessing. Prices and lead times only in a quotation.

How we proceed
Measured aerator load and night hours → bank proposal → first pond → later ponds. Prices, quantities and lead times only in the formal offer.
Send the aerator load and night hours and request a proposal
LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.