The Growatt SPF 3500 ES and 5000 ES are widely used off-grid and hybrid inverters. On site the installer sets Program 05 to lithium, then has to choose a protocol in Program 36, and wire the BMS port the right way. Anyone searching for a Growatt SPF Program 05 and Program 36 lithium checklist wants the maker’s own steps, not a code copied from another job.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen, not a factory, and we make no claim about Growatt products. The public SPF 3500/5000 ES user manual says that Program 05 battery type LI opens Program 36 for protocol selection, with L01–L50 on RS485 and L51–L99 on CAN. The BMS port is described as pin 1 RS485B, pin 2 RS485A, pin 4 CANH and pin 5 CANL. In LI mode, programs 12, 13 and 21 show state of charge; the maximum charging current is set by the BMS; and output cuts off if BMS communication fails. The same manual tells the installer to get instruction from Growatt to choose which protocol to use. A code on that list is not an approval of a pack.

Request a battery checklist for a Growatt SPF job · WhatsApp +86 159 8945 0735
What the SPF manual says
| Point | Public source | What to confirm per project |
|---|---|---|
| Program 05 | battery type LI opens Program 36 | that LI is actually selected, not a lead-acid type |
| Program 36 | L01–L50 RS485, L51–L99 CAN | the code chosen, and Growatt’s instruction on which to use |
| BMS port pins | 1 RS485B, 2 RS485A, 4 CANH, 5 CANL | cable pinout at both ends |
| LI-mode displays | programs 12/13/21 show SOC %; max charge current set by the BMS | that SOC appears after communication is up |
| Communication loss | output cuts off when BMS communication fails | how the site should behave if the cable comes loose |
We do not publish a recommended Program 36 code for an LJY pack or for any third-party pack. The installer confirms the protocol against the SPF firmware and, as the manual asks, with instruction from Growatt, and with a test if needed.
What the installer sends before a proposal
- SPF model (3500 ES or 5000 ES) and firmware.
- Pack voltage, series count and BMS.
- Whether the cable is intended for RS485 or CAN.
- Program 05 and Program 36 values already tried, if any.
- Whether Growatt has given written instruction on the protocol.
Get the protocol instruction first
Installers who obtain Growatt’s protocol guidance, then confirm it on a first SPF unit, avoid rolling an untested code across a row of off-grid jobs. Prices and lead times only in a quotation.

How we proceed
SPF model, pack data and port → checklist against the manual → first test → later jobs. Prices and lead times only in the formal quote. We do not publish a compatibility verdict.
Send the SPF model and pack data and request a checklist
LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.