Growatt SPF: lithium Programs 05 and 36 checklist

The Growatt SPF 3500 ES and 5000 ES are widely used off-grid and hybrid inverters. On site the installer sets Program 05 to lithium, then has to choose a protocol in Program 36, and wire the BMS port the right way. Anyone searching for a Growatt SPF Program 05 and Program 36 lithium checklist wants the maker’s own steps, not a code copied from another job.

LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen, not a factory, and we make no claim about Growatt products. The public SPF 3500/5000 ES user manual says that Program 05 battery type LI opens Program 36 for protocol selection, with L01–L50 on RS485 and L51–L99 on CAN. The BMS port is described as pin 1 RS485B, pin 2 RS485A, pin 4 CANH and pin 5 CANL. In LI mode, programs 12, 13 and 21 show state of charge; the maximum charging current is set by the BMS; and output cuts off if BMS communication fails. The same manual tells the installer to get instruction from Growatt to choose which protocol to use. A code on that list is not an approval of a pack.

A Growatt inverter photographed on a test bench, used as context for the official Program 05 and 36 settings
Photo: Asurnipal, Wikimedia Commons, CC BY-SA 4.0 (resized, WebP). Illustration, not an LJY product.

Request a battery checklist for a Growatt SPF job · WhatsApp +86 159 8945 0735

What the SPF manual says

PointPublic sourceWhat to confirm per project
Program 05battery type LI opens Program 36that LI is actually selected, not a lead-acid type
Program 36L01–L50 RS485, L51–L99 CANthe code chosen, and Growatt’s instruction on which to use
BMS port pins1 RS485B, 2 RS485A, 4 CANH, 5 CANLcable pinout at both ends
LI-mode displaysprograms 12/13/21 show SOC %; max charge current set by the BMSthat SOC appears after communication is up
Communication lossoutput cuts off when BMS communication failshow the site should behave if the cable comes loose

We do not publish a recommended Program 36 code for an LJY pack or for any third-party pack. The installer confirms the protocol against the SPF firmware and, as the manual asks, with instruction from Growatt, and with a test if needed.

What the installer sends before a proposal

  • SPF model (3500 ES or 5000 ES) and firmware.
  • Pack voltage, series count and BMS.
  • Whether the cable is intended for RS485 or CAN.
  • Program 05 and Program 36 values already tried, if any.
  • Whether Growatt has given written instruction on the protocol.

Get the protocol instruction first

Installers who obtain Growatt’s protocol guidance, then confirm it on a first SPF unit, avoid rolling an untested code across a row of off-grid jobs. Prices and lead times only in a quotation.

A close view of an inverter display on a test bench, used only as commissioning context, not as a pairing claim
Photo: Asurnipal, Wikimedia Commons, CC BY-SA 4.0 (resized, WebP). Illustration, not an LJY product.

How we proceed

SPF model, pack data and port → checklist against the manual → first test → later jobs. Prices and lead times only in the formal quote. We do not publish a compatibility verdict.

Send the SPF model and pack data and request a checklist

LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.