Dyness B4850 CAN and RS485: DIP and baud checklist

The Dyness B4850 is a 48V-class rack module used with many hybrid and off-grid inverters. On site the installer sets a bank of DIP switches, chooses CAN or RS485, and hopes the inverter shows battery data. Anyone searching for Dyness B4850 CAN and RS485 DIP settings wants the maker’s own figures, not a copied setting from another 48V-class pack.

LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen, not a factory, and we make no claim about Dyness products. The public AU manual describes a 48V nominal, 50Ah / 2.4 kWh module, a 42–54V working window, a 53.5V charge voltage, and a single CAN/RS485 port that leaves the factory in CAN. DIP switch 4 sets the baud: off for CAN 500k / RS485 9600, on for CAN 250k / RS485 115200. Master DIP positions are listed per inverter family in that manual.

A wall-mounted solar inverter with a front display
Photo: Russell Neches, Wikimedia Commons, CC BY 2.0 (resized, WebP). Illustration, not an LJY product.

Request a pairing check for a Dyness B4850 or a 51.2V pack · WhatsApp +86 159 8945 0735

What the Dyness B4850 manual says

PointPublic sourceWhat to confirm per project
Module class48V nominal, 50Ah / 2.4 kWh, working 42–54V, charge 53.5Vthat this is the module on site, not a 16S 51.2V pack
PortCAN and RS485 share one port; factory default CANwhich protocol the inverter expects
DIP switch 4 (baud)OFF: CAN 500k / RS485 9600; ON: CAN 250k / RS485 115200baud on both ends
Master DIPpositions listed per inverter family in the AU manualthe row that matches the inverter and firmware
Current limitsrecommended 25A, max 50A continuous, peak 100A for 15sinverter charge and discharge settings

These figures belong to the B4850, a 48V-class module of the 15S type. They are not copied onto a 16S 51.2V pack just because both are called 48V or because the inverter offers a Dyness protocol.

Checklist before commissioning

  • Inverter model and firmware, and which Dyness manual edition is being used.
  • Series count and charge window of the battery actually on site.
  • CAN or RS485, the DIP-4 baud setting, and the cable pinout on both ends.
  • Master DIP row taken from the B4850 manual only if the module is a B4850.
  • Values shown on the inverter after the link comes up, written down with the firmware.

Write down the working DIP

Installers who photograph the DIP bank and note the firmware can repeat a working B4850 site without guessing the baud again. Prices and lead times only in a quotation.

A voltage transformer coil inside power-conversion equipment
Photo: BambuFlute, Wikimedia Commons, CC BY-SA 4.0 (resized, WebP). Illustration, not an LJY product.

How we proceed

Your inverter model and firmware → our protocol notes → bench or site test → documented pairing. We do not publish compatibility verdicts.

Send your inverter model and firmware and request a check

LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.