When the power goes out, the question is never how big the battery is — it is how long the things that matter keep running. A home UPS or inverter battery exists for one job: keep the router online, the lights on, the fridge cold and the laptop working until the mains returns. That is a sizing question, not a shopping question, and it has a simple answer: add up the watts of the loads you will actually run, multiply by the hours you need them, and buy the battery that holds that much usable energy with margin. A Wi-Fi router and modem draw roughly 10–20 W, an LED bulb 8–10 W, a laptop 30–70 W; a fridge runs at 100–250 W while its compressor is on and surges to 600–1,200 W for a moment at startup, so its average draw across a day is far lower than its label. Check the nameplate on your own appliances — these are typical ranges, and the label on your unit is the real number. This guide works through the runtime formula, the battery count for 12 V, 24 V and 48 V systems, and worked examples for the loads families ask about most: router and lights, the fridge, and the home office.
LJY Energy is a LiFePO4 battery supplier and OEM/ODM coordinator in Shenzhen; we are not a factory. This guide covers the battery side of a single-phase home UPS or inverter system only — how to size the battery bank, how many batteries the system voltage needs, and what to send us for a written sizing proposal. The UPS or inverter itself, the wiring and the installation come from your installer or your existing unit. Two boundaries matter. First, a car starter battery is not a storage battery: it is built for short cranking bursts, with thin plates that wear out fast under hours of deep discharge, so it is a poor and short-lived choice for UPS backup even when the voltage matches. Second, this guide is about low-voltage home systems — 12 V, 24 V and 48 V — not about high-voltage or commercial battery strings. Start with one battery and add more in parallel as the load grows; the parallel limit for a bank is confirmed per project in the quotation, because it depends on the BMS configuration of the batteries you order.

Sizing reference
| Voltage classes covered | 12 V · 24 V · 48 V |
| Router and lights battery | 12.8 V · 100 Ah · 1.28 kWh |
| Work-from-home battery | 12.8 V · 200 Ah · 2.56 kWh |
| Fridge and essentials battery | 25.6 V · 100 Ah · 2.56 kWh |
| Whole-room backup battery | 51.2 V · 100 Ah · 5.12 kWh |
| Usable depth of discharge, LiFePO4 | 80–90% |
| Usable depth of discharge, lead-acid | 50% |
| Batteries in series, by system voltage | 1 · 2 · 4 |
| Parallel expansion limit | — |
Battery specifications live on the 12V 100Ah deep-cycle LiFePO4 battery page; confirm values on the product page and in the written quotation for your project.
Worked example
A 100 W critical load — router, a few LED lights and phone charging — running for 4 hours needs 400 Wh of usable energy. A 12V 100Ah battery holds 1.28 kWh; at 80% depth of discharge about 1.02 kWh is usable, so the same battery runs that load for about 10 hours. Count batteries in 12 V units: a 24 V inverter needs two 12 V batteries in series, a 48 V inverter four, while a single 51.2 V module covers a 48 V system on its own. Size from your own metered load, not from a copied example: the runtime formula is Ah × V × DoD × efficiency ÷ load watts, and the parallel limit for adding a second battery is confirmed per project in the quotation.
What to send before a proposal
- UPS or inverter make, model and DC voltage (12 V, 24 V or 48 V)
- Load list in watts and the backup hours you need — metered if possible, nameplate if not
- Whether this replaces an existing battery bank, and the space available for the new bank
Request a sizing
Send the UPS or inverter model, the load list and the backup hours. LJY Energy will work out the battery size and answer it in the quotation itself — which is where it belongs. Start with one battery and add more in parallel as the load grows; the expansion model is fixed from day one so a second battery in year two is a swap-in, not a redesign. We coordinate OEM/ODM battery supply from Shenzhen; we are not a factory, and every order is confirmed in writing before production.

Request a home UPS battery sizing · WhatsApp +86 159 8945 0735