The X1-HYB-LV 3.0, 3.7, 4.0, 5.0 and 6.0 kW units are single-phase hybrid inverters in the SolaX X1-Hybrid LV family. Anyone searching for a SolaX X1-HYB-LV CAN RS485 checklist needs the official battery-voltage window, the current limit by model and the ports, not a compatibility verdict inferred from a 51.2V name or copied from a Sunsynk SG04LP1 sheet or from a Deye SUN-SG03LP1 or SUN-SG04LP3 row. The official range is 40–60 V; 60 V is confirmed per project.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen; we are not a factory and we do not sell this inverter. We coordinate 51.2V modules with CAN or RS485 when a project asks for that port. The charge window and the intended port are confirmed per inverter model and firmware. We do not publish a compatibility verdict on this page.

Request the SolaX X1-HYB-LV checklist · WhatsApp +86 159 8945 0735
What the official X1-Hybrid LV datasheet states
| Point | Published fact | What the installer confirms |
|---|---|---|
| Models | X1-HYB-LV 3.0, 3.7, 4.0, 5.0 and 6.0 kW | the rating plate on the unit on site |
| Battery type | Lithium or Lead-acid | the chemistry of the bank on site |
| Voltage range | 40–60 V; 60 V is confirmed per project | the pack’s planned charge-voltage limit against this window |
| Current | 75 A charge/discharge on the smaller models; 120 A on the 5.0 and 6.0 kW models | the limit of this model and of the bank |
| Interface | RS485 and CAN | the intended method in the inverter documents |
| Other families | not Sunsynk SG04LP1 and not Deye SUN-SG03LP1 / SUN-SG04LP3 | do not copy figures from those families |
| Verdict | none is published on this page; a 51.2V name is not an approval | protocol and window confirmed per model and firmware |
A 51.2V name is not an approval. The official window of this family is 40–60 V; 60 V is confirmed per project. Figures from Sunsynk SG04LP1 or from Deye SUN-SG03LP1 or SUN-SG04LP3 do not belong on this checklist.
What the installer sends before a proposal
- Device type (3.0, 3.7, 4.0, 5.0 or 6.0 kW) and firmware version.
- Pack voltage, series count and BMS.
- The planned charge-voltage limit, checked against the 40–60 V window; 60 V is confirmed per project.
- Whether the cable is intended for CAN or for RS485.
- A written confirmation from the battery supplier, if available.
Treat the X1-Hybrid LV as its own datasheet
Installers who record the window, the current limit of this model and the intended port on the first unit, instead of copying figures from a Sunsynk or Deye family, avoid a silent mismatch after several rooms are already wired. Prices and lead times only in a quotation.

Request a written check
Send the inverter model, the firmware, the pack series count and the intended port. We reply with the official window and the points still to be confirmed, not with a verdict.
LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.
