The L1 series (R3KL1 to R6KL1) is a single-phase low-voltage hybrid family. It is not the Megarevo split-phase 48 V family, and its battery-port facts must not be copied from those documents. Anyone searching for a Megarevo L1 R3KL1–R6KL1 40–58V CAN checklist needs the official voltage window, the 58 V maximum charge, the current by model and the CAN port, not a compatibility verdict inferred from a 51.2V name.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen, not a factory, and we do not claim to supply Megarevo products. This page quotes the official L1 product page only. A 51.2V name, or a window copied from a split-phase document, is not an approval. We do not publish a compatibility verdict. Protocol and the charge window are confirmed per inverter model and firmware.

Request a battery checklist for a Megarevo L1 job · WhatsApp +86 159 8945 0735
Facts taken from the official L1 product page
| Point | What the document states | The installer still confirms |
|---|---|---|
| Voltage window | 40–58 V; Lithium or Lead-acid; maximum charging voltage 58 V | charge end of the pack against this window |
| Current by model | maximum charge/discharge R3KL1 95/62.2 A, R3K6L1 95/76.5 A, R4KL1 95/83.3 A, R4K6L1 95/95.8 A, R5KL1 95/104.2 A, R6KL1 95/110 A | the limit of this L1 model and of the pack |
| BMS port | communication interface CAN | the intended method, taken from the battery documentation |
| Family | L1 R3KL1–R6KL1, not the split-phase 48 V family | the nameplate and the manual for this unit |
| Verdict | none is published on this page | protocol and window confirmed per model and firmware |
A 51.2V name, or a window copied from a split-phase document, is not an approval. The installer confirms the window, the current limit and the CAN port against this L1 model and the pack BMS.
What the installer sends before a proposal
- L1 model (R3KL1 to R6KL1) and firmware version.
- Pack voltage, series count and BMS.
- The charge-voltage limit planned, against the 40–58 V window and the 58 V maximum.
- Whether the cable is intended for the CAN interface.
- Written confirmation from the battery supplier, if available.
Treat the L1 series as its own family
Installers who record the window, the current limit and the CAN port on a first L1 unit, rather than copying a split-phase document, avoid a silent mismatch after several roofs are already wired. Prices and lead times only in a quotation.

How we proceed
L1 model, pack data and port → checklist against the official product page → first test → later jobs. Prices and lead times only in the formal quote. We do not publish a compatibility verdict.
Send the L1 model and pack data and request a checklist
LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.
