Around Banjul, Tanji, Gunjur and inland ponds, aerators have to keep running at night. A grid cut or a diesel set that is switched off can kill the stock before morning. Anyone searching for a LiFePO4 aerator battery for fish farms in The Gambia needs to turn the aerator’s measured input watts, and the night hours, into kWh — not copy the motor’s nameplate in kW. This page is about the bank that carries the aerator through the night. It is not a fishing-boat house-bank page, and we do not operate farms.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen; we are not a factory, we do not install on the pond, and we do not run farms. We coordinate 12.8V, 25.6V and 51.2V banks. Charging is by a charger, a hybrid controller or a generator, as specified per farm. Enclosures must cope with heat, splash and salt spray; that detail is confirmed per project. We do not publish guaranteed survival claims for stock.

Request a bank proposal for aerators on Gambia fish farms · WhatsApp +86 159 8945 0735
What the farm defines per pond
| Point | Why it matters | Confirmed per project |
|---|---|---|
| 12.8V | smaller paddlewheels or blowers | ampere-hours and autonomy |
| 25.6V | medium ponds | kWh and how many units share the bank |
| 51.2V wall-mounted | larger farms with a hybrid inverter | module count and inverter protocol |
| Night hours | the real run, not the motor plate | hours recorded on that pond |
| Heat, splash and salt spray | the bank lives next to the water | enclosure and placement per project |
The arithmetic is only a method: a 750 W input, measured at the aerator, for 10 hours asks for about 7.5 kWh, plus losses and a reserve. A night measured on that pond is worth more than a 1.5 kW motor plate.
What the farm sends before a proposal
- Measured input watts of each aerator, not only the motor nameplate.
- Typical night hours and how many units will share one bank.
- System voltage already used on the farm, if any.
- Heat, splash, salt spray and the space for the enclosure.
- Whether a generator or a hybrid controller will recharge the bank.
Prove one pond, then repeat the bank
Farms that instrument a first pond, with real night hours, and then freeze the bank size, can extend the same design to neighbouring ponds without guessing. Prices and lead times only in a quotation.

How we proceed
Measured input watts and hours → bank proposal → first pond → neighbouring ponds. Prices, quantities and lead times only in the formal offer.
Send the aerator load and night hours and request a proposal
LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.