Around Negombo lagoon, on the north-west coast, at Batticaloa and on inland tanks, shrimp and tilapia ponds run aerators through the night. A grid cut at 2 a.m. can lose a crop. Anyone searching for a LiFePO4 aerator battery for shrimp or tilapia farms in Sri Lanka needs to turn the aerator’s measured input watts and the night hours into kWh, not copy the motor nameplate in kW. Heat, humidity and splash around the pond also belong in the specification.
LJY Energy is a LiFePO4 supplier and OEM/ODM coordinator in Shenzhen, not a factory. We do not install aerators or run farms. We coordinate 12.8V, 25.6V and 51.2V banks, with a heated option if charging could fall below 0 °C in the hills. Capacity is sized from measured input watts × hours, plus losses and a reserve. Enclosures and terminals must suit splash and salt at coastal ponds; that is confirmed per site.

Request a bank proposal for aerators in Sri Lanka · WhatsApp +86 159 8945 0735
What the farm defines per pond
| Point | Why it matters | Confirmed per project |
|---|---|---|
| 25.6V | several mid-size aerators | kWh and module count |
| 51.2V wall-mounted | higher input watts or longer autonomy | kWh and inverter or DC arrangement |
| 12.8V | smaller paddle or one aerator | Ah and enclosure |
| Night hours | overnight plus outage reserve | recorded hours, not the kW plate |
| Splash and salt | coastal ponds around Negombo or Batticaloa | enclosure and terminals per site |
The arithmetic is only a method: two aerators at a measured 1.1 kW input each, running 10 hours, need about 22 kWh, plus losses and a reserve. A logged night on the pond is worth more than the motor plate.
What the farm sends before a proposal
- Number of aerators per pond and the measured input watts, not only the motor kW.
- Typical night hours and how often the grid fails.
- Whether the site is coastal (splash and salt) or an inland tank.
- The lowest night temperature expected, if any.
- Whether a generator already covers part of the night.
Prove one pond, then repeat
Farms that instrument a first pond through a real night and a cut, then freeze the module count, repeat the same bank on neighbouring ponds instead of guessing. Prices and lead times only in a quotation.

How we proceed
Aerator input and hours → bank proposal → first pond → neighbouring ponds. Prices, quantities and lead times only in the formal quote.
Send the aerator data and request a proposal
LJY Energy, Jack Lai. Unit 705, Building 1, Lecai Industrial Park, 10 Kaijing Road, Longtian Street, Pingshan District, Shenzhen 518122, China. +86 159 8945 0735.